HCM City strives to complete first metro project in 50 days

29/10/2024 21:54

The HCM City Urban Railway Management Board (MAUR) launched the Fifty Days and Nights to Complete Metro Line 1 (Bến Thành-Suối Tiên) campaign on October 28.

Metro line 1 will be completed all necessary work and procedure to begin commercial operations by December 22. — VNA/VNS Photo

HCM CITY — The HCM City Urban Railway Management Board (MAUR) launched the Fifty Days and Nights to Complete Metro Line 1 (Bến Thành-Suối Tiên) campaign on October 28.

The city launched the campaign on Monday to finalise all necessary work and procedures to begin commercial operations of metro line No. 1 by December 22.

The move came following directions from the city government to get the line operating by the end of this year after several delays.

Speaking at the event, head of MAUR Phan Công Bằng stated they would work with Metro Line 1 Co., Ltd. until December 20 to complete a large, complex workload and address unresolved issues.

From now until December 20, the MAUR and the Ho Chi Minh City Urban Railway No. 1 Company Limited (HURC1) will coordinate with all stakeholders to complete the remaining items and procedures.

The project's main phases have been completed after about 12 years of construction, including equipment installation and training of drivers and staff.

Bằng stressed: "All relevant units will work without a day off during the campaign to ensure its success."

HCM City authorities started a two-month trial run for the metro line since October 1.

MAUR added that the line would run 200 trips between 5am and 10pm during the first six months of commercial operation.

After that, the line will operate from 5am to 11pm, with 276 trips daily between Monday and Friday. On weekends and holidays, the number of trips will fall to 226.

The route is 19.7 kilometres long, including 2.6km of underground railway and 17.1km of elevated track.

It runs from Bến Thành Market in District 1 to Suối Tiên Theme Park in Thủ Đức City, through three underground stations and 11 stops above ground.

The line has a total of 17 trains, each capable of accommodating 930 passengers, including 147 sitting and 783 standing. — VNS

Theo vietnamnews.vn
https://vietnamnews.vn/society/1665944/hcm-city-strives-to-complete-first-metro-project-in-50-days.html
Copy Link
https://vietnamnews.vn/society/1665944/hcm-city-strives-to-complete-first-metro-project-in-50-days.html
    • Vietnam-UAE trade deal helps open path to Middle East, African markets: Minister
      The freshly-signed Comprehensive Economic Partnership Agreement (CEPA) between Vietnam and the United Arab Emirates (UAE) will not only mark a breakthrough in bilateral economic and trade cooperation but also serve as a strong impetus to attract substantial investment from the Middle Eastern nation in such sectors as energy, industry, high technology, and supply chain development.
    • Hung Yen promotes trade, investment in Germany for first time
      An investment promotion and trade cooperation conference between the northern province of Hung Yen and German partners took place in Berlin on October 28.
    • HCM City to host ASEAN Ceramics Exhibition
      The eighth edition of ASEAN Ceramics 2024 will take place from December 11 to 13 at the Saigon Exhibition and Convention Centre (SECC) in Ho Chi Minh City.
    • Learning Vietnamese with friends
      Knowing how to speak Vietnamese is always a plus for foreigners living here. Many want to learn Vietnamese to communicate with people and understand local culture. Hanoi Exploring, a small centre for teaching the Vietnamese language offers free classes on Saturday afternoons, where people can learn the language, make friends and simply have fun.
    • Hà Nội-Lào Cai passenger trains resume operations
      The trains, popular with visitors, will run at slower speeds due to safety reasons.
    • Experts share measures for injury prevention at conference
      The fourth national scientific conference on injury prevention was held on Monday in Hà Nội, featuring engaging discussions by over 200 Vietnamese and international healthcare professionals.
    Highlighted VietBao
    Don't miss
    HCM City strives to complete first metro project in 50 days
    POWERED BY ONECMS - A PRODUCT OF NEKO